Home Renovation Estimate Template

Renovation bids are compared side by side, and the cheapest one usually left something out. Break the job into demolition, materials, labor and disposal, and say what happens when you open a wall and find a surprise.

Open this template in the free tool

No sign-up. Totals, tax and deposit are worked out for you; print it or save it as a PDF.

Example line items

ItemUnitQtyExample price
Demolition and haul-awayjob1800–3,000
Bathroom tiling (labor)sq ft1208–20 / sq ft
Tiles and setting materialssq ft1304–15 / sq ft
Kitchen cabinet installationlinear ft1880–250 / ft
Final cleaningjob1150–400

Amounts are examples before tax, not price advice. Add sales tax or VAT where it applies.

What to put on the quote

  • Exact rooms and work, with brand or grade of the main materials.
  • Whether permits, disposal and protection of floors are included.
  • Schedule: start date, working days and what can delay it.
  • Warranty on workmanship and who handles defects.

Common mistakes

  • Using "allowance" figures without saying the client pays the difference.
  • No clause for hidden damage found during demolition.
  • Leaving out disposal and cleanup, then charging for them at the end.

Deposit, balance and validity

Typical terms are 10–30% deposit, progress payments at agreed milestones and the balance on completion. Keep the estimate valid for 30 days, and require a written change order with a price before any extra work.

Questions people ask

What if I find rot or old wiring after opening the walls?

Write that hidden conditions are priced as a change order once found, with photos, before you continue.

Should materials be itemised?

Itemise the main ones (tiles, fixtures, cabinets). Clients trust a bid more when they can see what they are buying.

Do I include permit fees?

Say clearly whether permits are included or billed at cost, and who applies for them.