Roofing Estimate Template

Roofing estimates get compared side by side by homeowners who have just found a leak or an insurance letter. Price per square, but list tear-off, underlayment, flashing and decking as their own lines, because those are where a cheap bid quietly cuts corners.

Open this template in the free tool

No sign-up. Totals, tax and deposit are worked out for you; print it or save it as a PDF.

Free download (no sign-up): Excel / Word

This estimate as a file you can fill in and send: the line items below, with amounts, tax and the total worked out by formulas.

How to use this file

  1. Download it and open it in Excel, Google Sheets, Numbers, Word or Google Docs.
  2. Put in your business details and the client, then replace the example lines and prices with your own. In Excel, amounts, tax and the total update as you type.
  3. Check the payment terms, then save it as a PDF and send it to the client.

Example line items

ItemUnitQtyExample price
Tear-off and disposal, one layersquare24100–250 / square
Architectural shingles installedsquare24350–650 / square
Synthetic underlayment and ice barriersquare2440–100 / square
Ridge and step flashingft608–20 / ft
Gutter replacement, aluminumft1206–15 / ft
Decking replacement where rottensheet570–120 each

Amounts are examples before tax, not price advice. Add sales tax or VAT where it applies.

What to put on the quote

  • Roof size in squares, pitch, number of layers coming off and how many stories up.
  • Shingle or metal product by brand and line, underlayment type and ventilation.
  • Flashing, drip edge, pipe boots and chimney work: replaced or reused.
  • A per-sheet price for rotten decking found after tear-off, with a cap the client approves.
  • Manufacturer warranty, your workmanship warranty, and cleanup including a magnetic nail sweep.

Common mistakes

  • Quoting before counting layers; a second layer of shingles doubles the tear-off.
  • Leaving decking off the estimate and arguing over every sheet once the old roof is off.
  • Reusing old flashing to win the bid, then owning the leak at the chimney.
  • Not saying who is responsible if rain comes while the roof is open.

Deposit, balance and validity

Deposit 30% on signing for material ordering, balance on completion and final walk-around. Rotten decking is billed at the per-sheet rate shown, with photos. Start dates depend on dry weather. Estimate valid for 30 days.

Questions people ask

Tear-off or roof-over?

An overlay on one existing layer costs less but adds weight and can shorten the new roof’s life. The estimate shows both options when the roof allows it.

What is a square?

One hundred square feet of roof surface. Prices per square make bids comparable as long as everyone measured the same roof.

Will you deal with my insurance adjuster?

We can meet the adjuster and provide photos and this itemized estimate. What the policy pays is between you and your insurer.