Asphalt Paving Estimate Template

Paving estimates go to homeowners with a cracked driveway and to property managers with a worn parking lot. Thickness and base are the whole job: two bids for the same square footage are not comparable if one lays 2 inches over dirt and the other 3 inches over compacted stone.

Open this template in the free tool

No sign-up. Totals, tax and deposit are worked out for you; print it or save it as a PDF.

Free download (no sign-up): Excel / Word

This estimate as a file you can fill in and send: the line items below, with amounts, tax and the total worked out by formulas.

How to use this file

  1. Download it and open it in Excel, Google Sheets, Numbers, Word or Google Docs.
  2. Put in your business details and the client, then replace the example lines and prices with your own. In Excel, amounts, tax and the total update as you type.
  3. Check the payment terms, then save it as a PDF and send it to the client.

Example line items

ItemUnitQtyExample price
Remove existing asphalt and haul offsq ft3,0001–3 / sq ft
Crushed stone base, 6 in. compactedsq ft3,0001.5–3 / sq ft
Hot-mix asphalt, 3 in. compactedsq ft3,0003–6 / sq ft
Parking stall stripingstall2015–40 each
Equipment mobilization (paver, roller)job1500–1,500
Traffic control, flaggerday2350–700 / day

Amounts are examples before tax, not price advice. Add sales tax or VAT where it applies.

What to put on the quote

  • Area measured, finished asphalt thickness after compaction, and base material and depth.
  • What happens to the old surface: milled, removed or overlaid, and where it is hauled.
  • Drainage and slope, and that low spots are not guaranteed where the base is not replaced.
  • Striping layout, accessible stalls and signs if included, and when the lot can reopen.
  • Sealcoating as a later, separate visit, and the workmanship warranty.

Common mistakes

  • Quoting an overlay on a failed base and getting the callback when the cracks come back.
  • Measuring the lot from a satellite map and missing the apron and the dumpster pad.
  • Not stating thickness after compaction, so a thinner bid looks like the same job.

Deposit, balance and validity

Deposit 30% on signing to book the plant and crew; balance on completion. Paving needs dry weather and minimum temperatures, so dates may move without penalty, and asphalt price rises over 10% before the work date are passed on with notice. Estimate valid for 30 days.

Questions people ask

How soon can I drive on new asphalt?

Usually after a day or two for cars, longer in hot weather. Avoid sharp turns on the spot and parked trailers for the first few weeks.

When should it be sealcoated?

Most contractors wait several months for the asphalt to cure, then sealcoat every few years. We quote it as a separate visit.

Is an overlay good enough?

If the base is sound and the cracks are only on the surface, an overlay can work. Alligator cracking and potholes usually mean the base has failed.